Google

 
AEDT Date

• Contact Us
• Higher Education Courses
• Higher Education Subjects
• TAFE Courses
• TAFE Subjects
• Search

2009 TAFE Subjects

TAFE
Faculty of Technical and Trades Innovation
School of Automotive and Engineering Technology
  1
ANALYSE A SIMPLE ELECTRICAL SYSTEM CIRCUIT
  2
ANALYSE AND MAP A VALUE CHAIN
  3
ANALYSE MANUAL HANDLING PROCESSES
  4
APPLY 5S PROCEDURES IN A MANUFACTURING ENVIRONMENT
  5
APPLY BASIC ECONOMIC AND ERGONOMIC CONCEPTS TO EVALUATE ENGINEERING APPLICATIONS
  6
APPLY BASIC FABRICATION TECHNIQUES
  7
APPLY COMPETITIVE MANUFACTURING PRACTICES
  8
APPLY COST FACTORS TO WORK PRACTICES
  9
APPLY ELECTROTECHNOLOGY PRINCIPLES IN AN ENGINEERING WORK ENVIRONMENT
  10
APPLY ENVIRONMENTAL REGULATIONS AND BEST PRACTICE IN A WORKPLACE OR BUSINESS
  11
APPLY MATHEMATICAL TECHNIQUES IN A MANUFACTURING, ENGINEERING OR RELATED
  12
APPLY MATHEMATICAL TECHNIQUES IN A MANUFACTURING, ENGINEERING OR RELATED
  13
APPLY PRINCIPLES OF OCCUPATIONAL HEALTH AND SAFETY IN THE WORK ENVIRONMENT
  14
APPLY PRINCIPLES OF OCCUPATIONAL HEALTH AND SAFETY IN THE WORK ENVIRONMENT
  15
APPLY PRINCIPLES OF OCCUPATIONAL HEALTH AND SAFETY IN THE WORK ENVIRONMENT
  16
APPLY PRINCIPLES OF OH&S IN A WORK ENVIRONMENT
  17
APPLY QUALITY PROCEDURES
  18
APPLY QUALITY PROCEDURES
  19
APPLY QUALITY STANDARDS
  20
APPLY QUALITY SYSTEMS
  21
APPLY QUALITY SYSTEMS
  22
APPLY RUST PREVENTION AND SOUND DEADENING MATERIALS
  23
APPLY SAFE WORKING PRACTICES
  24
APPLY SITE RISK MANAGEMENT SYSTEM
  25
APPLY STATISTICS TO PROCESSES IN MANUFACTURING
  26
ASSEMBLE AND TEST ELECTRONIC ENGINEERING EQUIPMENT AND MAKE IT OPERATIONAL
  27
ASSIST IN IMPLEMENTING A PROACTIVE MAINTENANCE STRATEGY
  28
ASSIST IN THE PREPARATION OF A BASIC WORKPLACE LAYOUT
  29
ASSIST IN THE PROVISION OF ON THE JOB TRAINING
  30
ASSIST IN THE PROVISION OF ON THE JOB TRAINING
  31
CARRY OUT DIAGNOSIS OF COMPLEX SYSTEM FAULTS
  32
CARRY OUT DIAGNOSTIC PROCEDURES
  33
CARRY OUT GAS METAL ARC (MIG) WELDING PROCEDURES
  34
CARRY OUT INDUSTRY RESEARCH
  35
CARRY OUT MAJOR SECTIONAL REPAIR
  36
CARRY OUT MINOR REPAIRS TO ELECTRICAL CIRCUITS/SYSTEMS
  37
CARRY OUT PRE-REPAIR OPERATIONS
  38
CARRY OUT TUNGSTEN ARE WELDING PROCEDURES
  39
CARRY OUT VEHICLE BODY AND UNDERFRAME ALIGNMENT
  40
CARRY OUT VEHICLE MEASUREMENT
  41
COMMUNICATE WITH INDIVIDUALS AND SMALL GROUPS
  42
COMMUNICATE WITH INDIVIDUALS AND SMALL GROUPS
  43
CONTRIBUTE TO THE APPLICATION OF A PROACTIVE MAINTENANCE STRATEGY
  44
CONTRIBUTE TO WORKPLACE COMMUNICATION
  45
CREATE ENGINEERING DRAWINGS USING COMPUTER AIDED SYSTEMS
  46
DETERMINE AND ESTABLISH INFORMATION COLLECTION REQUIREMENTS AND PROCESSES
  47
DETERMINE AND IMPROVE PROCESS CAPABILITY
  48
DETERMINE VEHICLE DAMAGE AND RECOMMENDED REPAIR PROCEDURE
  49
DEVELOP A COMPETITIVE MANUFACTURING SYSTEM
  50
DEVELOP A JUST IN TIME (JIT) SYSTEM
  51
DEVELOP A PROACTIVE MAINTENANCE STRATEGY
  52
DEVELOP AN INDIVIDUAL CAREER PLAN FOR THE ENGINEERING INDUSTRY
  53
DEVELOP AND MANAGE A PLAN FOR A SIMPLE MANUFACTURING RELATED PROJECT
  54
DEVELOP AND MANAGE SUSTAINABLE ENERGY PRACTICES
  55
DEVELOP AND MANAGE SUSTAINABLE ENVIRONMENTAL PRACTICES
  56
DEVELOP MANUFACTURING RELATED BUSINESS PLANS
  57
DEVELOP QUICK CHANGEOVER PROCEDURES
  58
DEVELOP THE APPLICATION OF ENTERPRISE SYSTEMS IN MANUFACTURING
  59
ENSURE PROCESS IMPROVEMENTS ARE SUSTAINED
  60
ESTABLISH RELATIONS WITH CUSTOMERS
  61
FABRICATE BASIC JEWELLERY ITEMS
  62
FACILITATE A JUST IN TIME (JIT) SYSTEM
  63
FACILITATE SCADA SYSTEMS IN A MANUFACTURING TEAM OR WORK AREA
  64
FACILITATE THE DEVELOPMENT OF A NEW PRODUCT
  65
FACILITATE THE USE OF PLANNING SOFTWARE SYSTEMS IN MANUFACTURING
  66
FOLLOW WORKPLACE OCCUPATIONAL HEALTH AND SAFETY PROCEDURES
  67
FORM, BEND AND SHAPE ENGINEERING MATERIALS
  68
HANDLE ENGINEERING MATERIALS
  69
IMPLEMENT A COMPETITIVE MANUFACTURING SYSTEM
  70
IMPLEMENT AND MONITOR ENVIRONMENTAL REGULATIONS IN THE AUTOMOTIVE MECHANICAL INDUSTRY
  71
IMPLEMENT AND MONITOR ENVIRONMENTAL REGULATIONS IN THE AUTOMOTIVE MECHANICAL INDUSTRY
  72
IMPROVE COST FACTORS IN WORK PRACTICES
  73
INTERACT WITH COMPUTING TECHNOLOGY
  74
INTERACT WITH COMPUTING TECHNOLOGY
  75
INTERPRET CUSTOMER REQUIREMENTS
  76
INTERPRET PRODUCT COSTS IN TERMS OF CUSTOMER REQUIREMENTS
  77
INTERPRET SPECIFICATIONS AND MANUALS
  78
INTERPRET SPECIFICATIONS AND MANUALS
  79
LEAD 5S IN A MANUFACTURING ENVIRONMENT
  80
LEAD CHANGE IN A MANUFACTURING ENVIRONMENT
  81
MAINTAIN EFFECTIVE WORKPLACE RELATIONSHIPS
  82
MAINTAIN MARINE VESSELS SURFACES
  83
MANAGE 5S SYSTEM IN A MANUFACTURING ENVIRONMENT
  84
MANAGE A VALUE CHAIN
  85
MANAGE PEOPLE RELATIONSHIPS
  86
MANAGE PERSONAL WORK PRIORITIES
  87
MANAGE RELATIONSHIPS WITH NON-CUSTOMER EXTERNAL ORGANIZATIONS
  88
MANAGE THE IMPACT OF CHANGE ON OWN WORK
  89
MANAGE WORKPLACE LEARNING
  90
MISTAKE PROOF A PRODUCTION PROCESS
  91
MONITOR AND MAINTAIN CONTINUOUS IMPROVEMENT OF SYSTEMS AND PROCESSES
  92
MONITOR AND MAINTAIN EQUIPMENT, TOOLS AND MACHINERY
  93
MONITOR AND MAINTAIN WORKPLACE ENVIRONMENT
  94
MONITOR PROCESS CAPABILITY
  95
OPTIMISE COST OF PRODUCT
  96
ORGANISE AND COMMUNICATE INFORMATION
  97
ORGANISE AND COMMUNICATE INFORMATION
  98
PARTICIPATE IN PRODUCT ENGINEERING
  99
PERFORM BASIC COMPUTATIONAL PRINCIPLES IN ENGINEERING WORK ACTIVITIES
  100
PERFORM BASIC MACHINING PROCESSES
  101
PERFORM BASIC WELDING AND THERMAL CUTTING PROCESSES TO FABRICATE ENGINEERING STRUCTURES
  102
PERFORM COMPUTATIONS
  103
PERFORM COMPUTATIONS
  104
PERFORM CUTTING, GRINDING AND TURNING OPERATIONS
  105
PERFORM ELECTICAL/ELECTRONIC DRAFTING
  106
PERFORM ENGINEERING MEASUREMENTS
  107
PERFORM ENGINEERING MEASUREMENTS
  108
PLAN A COMPLETE ACTIVITY
  109
PLAN A COMPLETE ACTIVITY
  110
PLAN TO UNDERTAKE A ROUTINE TASK
  111
PLAN TO UNDERTAKE A ROUTINE TASK
  112
PREPARE AND PROCESS MATERIALS AND COMPONENTS
  113
PREPARE AND USE/OPERATE EQUIPMENT, TOOLS AND/OR MACHINERY
  114
PREPARE VEHICLE/COMPONENT/EQUIPMENT FOR CUSTOMER USE
  115
PRODUCE BASIC ENGINEERING COMPONENTS AND PRODUCTS USING FABRICATION AND MACHINING
  116
PRODUCE BASIC ENGINEERING GRAPHICS
  117
PRODUCE BASIC ENGINEERING SKETCHES AND DRAWINGS
  118
PRODUCE DETAILED ENGINEERING DRAWINGS
  119
RECEIVE AND DISPATCH MATERIALS, EQUIPMENT AND TOOLS
  120
REMOVE AND REPLACE ELECTRICAL/ELECTRONIC UNITS/ASSEMBLIES
  121
REMOVE AND REPLACE MECHANICAL UNITS/ASSEMBLIES
  122
REMOVE AND REPLACE VEHICLE BODY PANELS, PANEL SECTIONS AND ANCILLARY FITTINGS
  123
REMOVE AND REPLACE/FIT PROTECTOR MOULDINGS, TRANSFERS AND DECALS
  124
REPAIR MINOR STRUCTURAL DAMAGE
  125
REPLACE MAJOR WELDED PANELS
  126
REPORT TECHNICAL INFORMATION
  127
REPORT TECHNICAL INFORMATION
  128
RESEARCH AND ANALYSE ENGINEERING INFORMATION
  129
RESEARCH AND ANALYSE ENGINEERING INFORMATION
  130
RESEARCH AND PREPARE PRESENTATIONS AND REPORTS
  131
SELECT COMMON ENGINEERING MATERIALS
  132
SET UP BASIC HYDRAULIC CIRCUITS
  133
SET UP BASIC PNEUMATIC CIRCUITS
  134
SUPERVISE CIVIL WORKS
  135
SUSTAIN PROCESS IMPROVEMENTS
  136
TEST, SERVICE AND REPLACE BATTERY
  137
UNDERTAKE BASIC PROCESS PLANNING
  138
UNDERTAKE PROACTIVE MAINTENANCE ANALYSES
  139
UNDERTAKE PROCESS CAPABILITY IMPROVEMENTS
  140
UNDERTAKE ROOT CAUSE ANALYSIS
  141
UNDERTAKE VALUE ANALYSIS OF PRODUCT COSTS IN TERMS OF CUSTOMER REQUIREMENTS
  142
USE AND MAINTAIN WORKPLACE TOOLS AND EQUIPMENT
  143
USE BASIC ENGINEERING CONCEPTS TO PLAN THE MANUFACTURE OF ENGINEERING COMPONENTS
  144
USE CAD TO CREATE AND DISPLAY 3D MODELS
  145
USE CIVIL CONSTRUCTION HAND AND POWER TOOLS
  146
USE COMPUTER AIDED DESIGN SYSTEMS TO PRODUCE BASIC ENGINEERING DRAWINGS
  147
USE COMPUTERS FOR ENGINEERING RELATED WORK ACTIVITIES
  148
USE FUNDAMENTAL REFRIGERATION PRINCIPLES AND PROCESSES TO FABRICATE ENGINEERING STRUCTURES
  149
USE GRAPHICAL TECHNIQUES AND PERFORM SIMPLE STATISTICAL COMPUTATIONS
  150
USE GRAPHICAL TECHNIQUES AND PERFORM SIMPLE STATISTICAL COMPUTATIONS
  151
USE HAND TOOLS
  152
USE PLANNING SOFTWARE SYSTEMS IN MANUFACTURING
  153
USE POWER TOOLS/HANDHELD OPERATIONS
  154
USE RESOURCE PLANNING SOFTWARE SYSTEMS IN MANUFACTURING
  155
USE SCADA SYSTEMS IN MANUFACTURING
  156
USE STRUCTURED PROBLEM SOLVING TOOLS
  157
USE SUSTAINABLE ENERGY PRACTICES
  158
USE SUSTAINABLE ENVIRONMENTAL PRACTICES
  159
WORK EFFECTIVELY WITH OTHERS IN TEAMS
  160
WORK SAFELY WITH INDUSTRIAL CHEMICALS AND MATERIALS
  161
WORK WITH OTHERS IN A MANUFACTURING, ENGINEERING OR RELATED ENVIRONMENT
  162
WORK WITH OTHERS IN A MANUFACTURING, ENGINEERING OR RELATED ENVIRONMENT
School of Construction Industries
  1
ABOVE GROUND DRAIN
  2
ADMINISTER A CONSTRUCTION CONTRACT
  3
ADMINISTER THE LEGAL OBLIGATIONS OF A BUILDING OR CONSTRUCTION CONTRACT
  4
ADVANCED GAS
  5
ADVANCED MECHANICAL SERVICES
  6
ADVANCED ROOFING
  7
ADVANCED WASTE DISPOSAL AND DRAINAGE
  8
ADVANCED WATER SUPPLY
  9
ALUMINIUM FABRICATION
  10
ANALYSE AND PRESENT BUILDING SURVEYING RESEARCH INFORMATION
  11
APPLIANCE SERVICING
  12
APPLICATION OF OIL BASED PAINTS
  13
APPLICATION OF WATER BASED PAINTS
  14
APPLIED MATHEMATICS FOR BUILDING
  15
APPLY AND INSTALL SEALANT AND SEALANT DEVICES
  16
APPLY AND TRIM DECORATIVE FINISHES
  17
APPLY BASIC LEVELLING PROCEDURES
  18
APPLY BUILDING CODES AND STANDARDS TO BUILDINGS UP TO 3 STOREYS
  19
APPLY BUILDING CODES AND STANDARDS TO RESIDENTIAL BUILDINGS
  20
APPLY BUILDING CODES AND STANDARDS TO THE CONSTRUCTION PROCESS FOR LOW-RISE BUILDING PROJECTS
  21
APPLY BUILDING CODES AND STANDARDS TO THE CONSTRUCTION PROCESS FOR MEDIUM-RISE BUILDING PROJECTS
  22
APPLY BUILDING CONTROL LEGISLATION TO BUILDING SURVEYING
  23
APPLY BUILDING SURVEYING PROCEDURES TO BUILDINGS UP TO 3 STOREYS
  24
APPLY BUILDING SURVEYING PROCEDURES TO RESIDENTIAL BUILDINGS
  25
APPLY CLEAR TIMBER FINISH
  26
APPLY DECORATIVE FINISHES
  27
APPLY DRAFTING OFFICE ADMINISTRATION PROCESSES
  28
APPLY DRAFTING OFFICE PROJECT ADMINISTRATION PROCESSES
  29
APPLY ECOLOGICALLY SUSTAINABLE DEVELOPMENT PRINCIPLES TO THE BUILT ENVIRONMENT
  30
APPLY FIBRE REINFORCED PLASTICS
  31
APPLY FINISHES
  32
APPLY FIRE TECHNOLOGY TO BUILDINGS UP TO 3 STOREYS
  33
APPLY FIRST AID
  34
APPLY FIRST AID IN THE WORKPLACE
  35
APPLY FOOTING AND GEOMECHANICAL DESIGN PRINCIPLES FOR DOMESTIC SCALE BUILDINGS
  36
APPLY FOOTINGS AND GEOMECHANICAL DESIGN PRINCIPLES TO BUILDINGS UP TO 3 STOREYS
  37
APPLY GILDING TO SIGNS
  38
APPLY GRAPHICS TO ILLUMINATED SIGNFACES
  39
APPLY GRAPHICS USING PRESSURE SENSITIVE FILMS
  40
APPLY INDUSTRIAL PROTECTIVE COATINGS
  41
APPLY LEGAL PROCEDURES TO BUILDING SURVEYING
  42
APPLY LEGAL REQUIREMENTS TO BUILDING AND CONSTRUCTION PROJECTS
  43
APPLY LEGISLATION TO URBAN DEVELOPMENT AND BUILDING CONTROLS
  44
APPLY LINE AND SCROLL
  45
APPLY MANUFACTURED BOARD CONVERSION TECHNIQUES
  46
APPLY PAINT BY BRUSH/ROLLER
  47
APPLY PAINT BY SPRAY
  48
APPLY PRINCIPLES OF CONSTRUCTION TECHNOLOGY TO PRIVATE RESIDENTIAL DWELLINGS
  49
APPLY PRINCIPLES OF CONSTRUCTION TECHNOLOGY TO TYPE 'B' AND 'C' COMMERCIAL BUILDINGS
  50
APPLY PRINCIPLES OF DESIGN, DOCUMENTATION AND PROJECT ADMINISTRATION TO BUILDINGS
  51
APPLY PRINCIPLES OF ENERGY EFFICIENT DESIGN TO BUILDINGS
  52
APPLY PRINCIPLES OF ENVIRONMENTAL SUSTAINABILITY TO BUILDING DESIGN
  53
APPLY PRINCIPLES OF TIMBER FRAMING DESIGN TO ONE OR TWO STOREY BUILDINGS
  54
APPLY PROTECTIVE COATINGS (BASIC)
  55
APPLY QUALITY PROCEDURES
  56
APPLY QUALITY SYSTEMS
  57
APPLY SHEET LAMINATES BY HAND
  58
APPLY SITE SURVEYS AND SET OUT PROCEDURES TO MEDIUM-RISE BUILDING PROJECTS
  59
APPLY SOLID RENDER
  60
APPLY STRUCTURAL PRINCIPLES TO COMMERCIAL LOW-RISE CONSTRUCTIONS
  61
APPLY STRUCTURAL PRINCIPLES TO THE CONSTRUCTION OF MEDIUM-RISE BUILDINGS
  62
APPLY STRUCTURLA PRINCIPLES TO RESIDENTIAL LOW-RISE CONSTRUCTIONS
  63
APPLY TEXTURE COATINGS
  64
APPLY WALLPAPER
  65
APPLY WATER GILDING - GLASS
  66
ARCHITECTURAL HISTORY 1
  67
ARCHITECTURAL HISTORY 2
  68
ARCHITECTURAL PHOTOGRAPHY
  69
ARRANGE RESOURCES AND PREPARE FOR THE BUILDING OR CONSTRUCTION PROJECT
  70
ASSEMBLE (DOOR/WINDOWS)
  71
ASSEMBLE ALUMINIUM FRAMEWORK
  72
ASSEMBLE AND INSTALL STAIRS
  73
ASSEMBLE CABINETS, SHOWCASES, WALL UNITS, COUNTERS AND WORK STATIONS
  74
ASSEMBLE COMPONENTS
  75
ASSEMBLE FABRICATED COMPONENTS
  76
ASSEMBLE FURNISHING COMPONENTS
  77
ASSEMBLE PARTITIONS
  78
ASSEMBLE SIMPLE PARTITION FRAMES
  79
ASSEMBLE/INSTALL SHOPFRONT, COMMERCIAL ENTRIES, BULKHEADS AND COMPONENTS
  80
ASSESS CONSTRUCTION FAULTS IN BUILDINGS UP TO 3 STOREYS
  81
ASSESS CONSTRUCTION FAULTS IN RESIDENTIAL BUILDINGS
  82
ASSESS STRUCTURAL REQUIREMENTS FOR BUILDINGS UP TO 3 STOREYS
  83
ASSESS STRUCTURAL REQUIREMENTS FOR DOMESTIC SCALE BUILDINGS
  84
ASSESS THE CONSTRUCTION OF BUILDINGS UP TO 3 STOREYS
  85
ASSESS THE CONSTRUCTION OF DOMESTIC SCALE BUILDINGS
  86
ASSESS THE IMPACT OF FIRE ON BUILDING MATERIALS
  87
ASSESS TIMBER FRAMED DESIGNS FOR ONE AND TWO STOREY BUILDINGS
  88
ASSIST IN THE PROVISION OF ON-THE-JOB TRAINING
  89
BASIC FIRST AID
  90
BASIC FIRST AID
  91
BASIC SETTING OUT
  92
BASIC SETTING OUT
  93
BASIN AND BIDET
  94
BATH
  95
BRICKLAYING BASIC SKILLS
  96
BRICKLAYING BASIC SKILLS
  97
BRICKLAYING CAVITY CONSTRUCTION PRINCIPLES
  98
BRICKLAYING CAVITY, PIERS AND WALL CONSTRUCTION
  99
BRICKLAYING HAND TOOLS
  100
BRICKLAYING HAND TOOLS
  101
BRICKLAYING SET OUT, BASE AND VENEER CONSTRUCTION
  102
BRICKLAYING VENEER CONSTRUCTION PRINCIPLES
  103
BUILDERS WORKING DRAWINGS 1A
  104
BUILDERS WORKING DRAWINGS 1B
  105
BUILDERS WORKING DRAWINGS 2
  106
BUILDING AND CONSTRUCTION INDUSTRY INDUCTIONS
  107
BUILDING COMPUTER APPLICATIONS 2
  108
BUILDING COMPUTING APPLICATIONS 1
  109
BUILDING CONSTRUCTION
  110
BUILDING CONTRACT LAW 1
  111
BUILDING DRAFTING EXPERIENCE 2
  112
BUILDING PRACTICAL EXPERIENCE 1
  113
BUILDING QUALITY CONCEPTS 1
  114
BUILDING QUANTITIES AND ESTIMATING 1
  115
BUILDING QUANTITIES AND ESTIMATING 2
  116
BUILDING QUANTITIES AND ESTIMATING 3
  117
BUILDING QUANTITIES AND ESTIMATING 4
  118
BUILDING SITE SUPERVISION
  119
BUILDING SITE SURVEYING AND SET OUT 1
  120
BUILDING SITE SURVEYING AND SET OUT 2
  121
BUILDING STAFF MANAGEMENT
  122
BUILDING STRUCTURES
  123
BUILDING STRUCTURES
  124
BUILDING STUDIO 1
  125
BUILDING STUDIO 2
  126
BUILDING STUDIO 3
  127
BUILDING STUDIO 4
  128
BUILDING STUDIO 5
  129
BUILDING TECHNOLOGY 1
  130
BUILDING TECHNOLOGY 2
  131
BUSINESS MANAGEMENT FOR BUILDING INDUSTRY 1
  132
BUSINESS MANAGEMENT FOR BUILDING INDUSTRY 2
  133
CALCULATIONS FOR THE BUILDING INDUSTRY
  134
CALCULATIONS FOR THE BUILING INDUSTRY
  135
CAREER STUDIES
  136
CAREER STUDIES
  137
CARPENTRY HAND TOOLS
  138
CARPENTRY HAND TOOLS
  139
CARPENTRY POWER TOOLS
  140
CARPENTRY POWER TOOLS
  141
CARRY OUT A SITE SURVEY OF AN EXISTING BUILDING
  142
CARRY OUT BASIC DEMOLITION
  143
CARRY OUT CAVITY BRICK CONSTRUCTION
  144
CARRY OUT CONCRETING TO SIMPLE FORMS
  145
CARRY OUT EXCAVATION
  146
CARRY OUT EXCAVATION AND INSTALL SUPPORT
  147
CARRY OUT GENERAL DEMOLITION
  148
CARRY OUT GENERAL DEMOLITION TO MINOR BUILDING STRUCTURES
  149
CARRY OUT INTERACTIVE WORKPLACE COMMUNICATION
  150
CARRY OUT LEVELLING
  151
CARRY OUT LEVELLING
  152
CARRY OUT LEVELLING OPERATIONS
  153
CARRY OUT LOAD SLINGING OF OFF-SITE MATERIALS
  154
CARRY OUT MASONRY VENEER CONSTRUCTION
  155
CARRY OUT MEASUREMENTS AND CALCULATIONS
  156
CARRY OUT MEASUREMENTS AND CALCULATIONS
  157
CARRY OUT MECHANICAL CUTTING
  158
CARRY OUT OH&S REQUIREMENTS
  159
CARRY OUT SETTING OUT
  160
CARRY OUT SOLID BRICK CONSTRUCTION
  161
CARRY OUT TRIP PREPARATION AND PLANNING
  162
CARRY OUT TUCK POINTING TO BRICKWORK
  163
CARRY OUT VENEER CONSTRUCTION
  164
CHECK OPERATIONAL CAPABILITY OF MARINE CRAFT
  165
CHECK OPERATIONAL CAPABILITY OF SAILS AND SAIL OPERATING EQUIPMENT
  166
CLASSIFY RECREATIONAL BOATING TECHNOLOGIES AND FEATURES
  167
CLOTHES WASHING MACHINE
  168
COLLECT AND STORE ROOF WATER
  169
COLOUR MIXING PRINCIPLES
  170
COLOUR THEORY AND PRACTICE
  171
COMBUSTION OF GASES AND FLAMES
  172
COMMERCIAL AND INDUSTRIAL GAS SUPPLY
  173
COMMISIONING A GAS APPLIANCE
  174
COMMISIONING WATER AND AIR SYSTEMS
  175
COMMUNICATE IN THE WORKPLACE
  176
COMMUNICATIONS FOR THE BUILDING INDUSTRY
  177
COMMUNICATIONS FOR THE BUILDING INDUSTRY
  178
COMPONENT SERVICING
  179
COMPUTER AIDED DRAFTING 1
  180
COMPUTER AIDED DRAFTING 2
  181
COMPUTER AIDED DRAFTING 3 3D MODELS
  182
COMPUTER AIDED DRAFTING 4 – SURFACE RENDERING
  183
COMPUTER AIDED DRAFTING 5 - ANIMATION
  184
COMPUTER AIDED DRAFTING 6 - CUSTOMISATION
  185
CONCRETE TECHNOLOGY
  186
CONDUCT ON-SITE SUPERVISION OF THE BUILDING AND CONSTRUCTION PROJECT
  187
CONDUCT WORKPLACE COMMUNICATION
  188
CONSTRUCT A PITCHED ROOF
  189
CONSTRUCT ADVANCED ROOFS
  190
CONSTRUCT AND ASSEMBLE MARINE VESSEL TIMBER STRUCTURES
  191
CONSTRUCT AND ERECT STEEL WALL FRAMING
  192
CONSTRUCT AND ERECT TIMBER WALL FRAMING
  193
CONSTRUCT AND INSTALL NON-LOAD BEARING INTERNAL PARTITION WALL
  194
CONSTRUCT BASIC TIMBER FURNISHING PRODUCT
  195
CONSTRUCT BATTERED MASONRY SURFACES
  196
CONSTRUCT BATTERED MASONRY WALLS AND PIERS
  197
CONSTRUCT BULKHEADS
  198
CONSTRUCT CEILING FRAMES
  199
CONSTRUCT CURVED WALL
  200
CONSTRUCT CURVED WALL
  201
CONSTRUCT DECORATIVE BRICKWORK
  202
CONSTRUCT EAVES
  203
CONSTRUCT FIREPLACE AND CHIMNEY
  204
CONSTRUCT FIREPLACES AND CHIMNEYS
  205
CONSTRUCT FURNITURE USING LEG AND RAIL METHOD
  206
CONSTRUCT JIGS AND FIXTURES
  207
CONSTRUCT JIGS AND FIXTURES
  208
CONSTRUCT MASONRY ARCH - SEMI-CIRCULAR AND SEGMENTAL
  209
CONSTRUCT MASONRY ARCHES
  210
CONSTRUCT MASONRY BLOCKWORK
  211
CONSTRUCT MASONRY STEPS AND STAIRS
  212
CONSTRUCT MASONRY STEPS AND STAIRS
  213
CONSTRUCT MASONRY STRUCTURAL SYSTEMS
  214
CONSTRUCT TIMBER EXTERNAL STAIRS
  215
CONSTRUCT TIMBER EXTERNAL STAIRS
  216
CONSTRUCT TIMBER ROOF STRUCTURES - IRREGULAR ROOFS
  217
CONSTRUCT WALL FRAMES
  218
CONSTRUCT WET AREA CONSTRUCTION/INSTALLATION
  219
CONSTRUCT, ERECT AND DISMANTLE FORMWORK FOR STAIRS AND RAMPS
  220
CONSTRUCTION 1
  221
CONSTRUCTION 2
  222
CONSTRUCTION 3
  223
CONSTRUCTION 4
  224
CONSTRUCTION PLANNING 1
  225
CONSTRUCTION SAFETY
  226
COOKER
  227
CO-ORDINATE ASSET REFURBISHMENT
  228
COST CONTROL AND PLANNING 1
  229
COST CONTROL AND PLANNING 2
  230
CREATE DECORATIVE BACKGROUNDS
  231
CREATE TECHNICALLY PROJECTED PRESENTATION VIEWS OF ARCHITECTURAL DESIGN CONCEPTS
  232
CUT AND BEND MATERIALS USING OXY/LPG EQUIPMENT
  233
CUT AND FLASH PENETRATIONS
  234
CUT AND INSTALL GLASS
  235
CUT AND JOIN SHEET METAL
  236
CUT WITH OXY-LPG/ACETYLENE
  237
CUTTING A BRANCH INTO AN EXISTING DRAIN
  238
DELIVER A SERVICE TO CUSTOMERS
  239
DESIGN 1
  240
DESIGN 2
  241
DESIGN 3
  242
DESIGN 4
  243
DESIGNING FLUSHING SYSTEMS
  244
DESIGNING SANITARY PLUMBING SYSTEMS
  245
DESIGNING SEWERAGE DRAINS
  246
DESIGNING STORM WATER DRAINS
  247
DETERMINE REQUIRED SERVICES, LAYOUT AND CONNECTION METHODS TO COMMERCIAL BUILDINGS
  248
DEVELOP BASIC ILLUMINATED SIGNFACES
  249
DEVELOP KNOWLEDGE OF DESIGN TERMINOLOGY AND CONCEPTS FOR INDUSTRY CONTEXT
  250
DEVELOP, IMPLEMENT & PROMOTE EFFECTIVE COMMUNICATION TECHNIQUES
  251
DISHWASHING MACHINE
  252
DISPOSAL SYSTEM JOINTS
  253
DOMESTIC SEPTIC TANKS
  254
DOOR AND WINDOW CONSTRUCTION
  255
DRAFTING FOR THE JOINERY/SHOPFITTING/STAIRBUILDING INDUSTRY
  256
DRAFTING PRACTICAL EXPERIENCE 1
  257
DRAFTING PRACTICAL EXPERIENCE 2
  258
DRAFTING STUDIO 1
  259
DRAFTING STUDIO 2
  260
DRAFTING STUDIO 3
  261
DRAFTING STUDIO 4
  262
DRAFTING STUDIO 5
  263
DRAFTING TECHNOLOGY 1
  264
DRAFTING TECHNOLOGY 2
  265
DRAFTING TECHNOLOGY 3
  266
DRAFTING TECHNOLOGY 4
  267
DRAIN WORKSITE
  268
DRAW AND INTERPRET SKETCH
  269
DRAWING OFFICE PRACTICE 1
  270
DRAWING OFFICE PRACTICE 2
  271
ELECTRIC WELDING
  272
ELECTRONICS AND ELECTRICITY IN GAS APPLIANCES
  273
ERECT AND DISMANTLE FORMWORK FOR FOOTINGS AND SLABS ON GROUND
  274
ERECT AND DISMANTLE FORMWORK TO SUSPENDED SLABS, COLUMNS, BEANS AND WALLS
  275
ERECT AND DISMANTLE JUMP FORM FORMWORK
  276
ERECT AND DISMANTLE RESTRICTED HEIGHT SCAFFOLDING
  277
ERECT AND DISMANTLE SLIP FORM FORMWORK
  278
ERECT AND STRIP FORMWORK FOR CONCRETE WORK
  279
ERECT CEILING FRAMING (PITCHED ROOF)
  280
ERECT DOOR JAMB/FRAME (BUILT-IN UNIT)
  281
ERECT ROOF TRUSSES
  282
ERECT STEEL ROOF TRUSSES
  283
ERECT TIMBER PITCHED ROOF FRAMING
  284
ERECT TIMBER ROOF TRUSSES